On this page

Risk Register allows you to **create**, **track**, and **mitigate** Privacy Risks across your organization. This functionality allows you to track risk proactively to support regulatory compliance and build customer trust.

## Adding Risks

**To add a new risk**, select the **Add Risk** button in the top right corner of the **Risk Register** page.

### Risk Details

The following **fields** are available to describe a new Privacy Risk:

| Field               | Required? | Description                                                                                                                                                  |
|---------------------|-----------|--------------------------------------------------------------------------------------------------------------------------------------------------------------|
| Risk Type           | Yes       | Select a standardized risk from our **pre-defined list**. This ensures consistency and powers our recommendation engine.                                     |
| Description         | No        | A default description will populate based on the risk type selected. Edit or add any additional context about the risk, including its **causes** and potential **consequences**. |
| System              | No        | If the risk is associated with a specific application or vendor, you can link it directly to a **system** from your [inventory](https://docs.datagrail.io/docs/ldm/system-inventory).  |
| Impact & Likelihood | Yes       | Assign a level for both the potential **impact** of the risk and its **likelihood** of occurring. The platform will automatically calculate an Overall Risk score for you. |
| Mitigation Status    | Yes       | Set the current status of the risk (e.g. **In Progress**, **Mitigated**, **Accepted**). By default, the status of a newly created risk will be **Not Started**.          |
| Assigned Owner      | No        | Assign the risk to a specific **person** or **team** by entering their email to establish clear accountability.                                          |
| Due Date            | No        | Set a target date for when the **mitigation plan** should be completed.                                                                                  |
| Comments            | No        | Add any relevant **notes** or **links** to resources for additional context.                                                                                |

### Adding Custom Risks

Don't see a risk from the default dropdown that meets your use case? Enter your desired name in the field and select **Create** to add a **custom risk type**.

### Mitigation Plans

Once you've selected a **Risk Type**, the platform will automatically provide you with a list of **Suggested Mitigation Plans**.

- **To select a suggestion:** Simply check the box next to the recommended plan.
- **To see more options:** Select **"View All Mitigation Plans"** to open our full library of controls. You can select one or more plans from this list.
- **No Action:** If you determine no mitigation is needed, you can select the **"No Action"** option.

## Deleting Risks

You can permanently remove a risk from your Risk Register when it's no longer needed.

1. Select the **risk** you want to delete.
2. Select the **three dots** in the bottom right corner.
3. Select **Delete Risk**.

**Permanent Action**  
Deleting a risk is permanent and cannot be undone.

## Create Risks From Assessments

Risks can also be created from [Assessments](https://docs.datagrail.io/docs/risk-management/risk-assessments/overview) to ensure all identified risks are captured in the Risk Register automatically.

Risks can be attached to **In Progress** or **Approved** Assessments in two ways. Once flagged, risks will immediately populate in Risk Register to be reviewed and completed. Risks will additionally be made accessible from within the Assessment.

### Flagging Answers

To associate an answer with a risk, hover over it, and select **Flag as Risk**.

### Flagging an Entire Assessment

To associate an entire assessment with a risk, select **Add Risk** at the bottom of the page.

### Managing Flagged Risks

All risks added from an Assessment are automatically populated in **Risk Register**, linking them back to the Assessment as their source.

The following **data points and indicators** are additionally available to help you manage risks sourced from Assessments:

- **From Within an Assessment:**
  1. **Total Risk Counter:** Counts the total risks associated with the entire Assessment. Located in the **top right**.
  2. **Section Risk Counter:** Counts the total risks associated with the Assessment section. Located next to **section name** in the sidebar.
- **From the Risk Assessments Table:**
  1. **Risks Filter:** Use this filter to identify Assessments associated with certain types of risks.
  2. **Risks Column** This column shows the number of risks associated with each Assessment. Hover over each number for quick information on the specific risks.

## Create Risks From Systems

Risks can additionally be created from [System Profile](https://docs.datagrail.io/docs/ldm/system-profiles) pages.

**To create a risk on a System Profile**, navigate to the **Risks** tab, where you will have the ability to view existing risks and add new ones.
